+86 15733638066

info@ijixian.cn

Knitting Machine Process Operating Procedures

Mar. 06, 2021

Teilen:


Here are the process operating procedures of the wire mesh knitting machine shared by the Wire Mesh Knitting Machine Supplier


Wire Mesh Knitting Machine

Wire Mesh Knitting Machine

1.Purpose:


Clarify the safety operation specifications of the Wire Mesh Weaving Machine to ensure the personal safety of the operators.


2. area:


Suitable for operators of braiding machines in the wire department


3. Braiding machine maintenance, maintenance and repair:


When adding lubricating oil, proper amount should be used to prevent splash and overflow.


Wipe the rags of the machine and replace the reported waste hardware accessories in the designated waste recycling bin.


Work protective equipment (gloves, sleeves, etc.) waste should be placed in designated recycling bins.


If there is a fire in the production, the power supply should be cut off immediately and fire-fighting facilities should be activated.


At the end of the work, the waste wires, copper wires and other waste generated on the day will be collected separately and placed in a unified recycling bin.


4. Safety precaution requirements:


The personnel in each process should strictly implement the requirements in accordance with the process operating procedures to prevent accidents.


Strengthen the training of employees and increase the awareness of safe production.


All operators should continuously improve their awareness of production safety, master operating skills proficiently, and contribute to the personal safety of themselves and others and the normal operation of production.


5. Quality requirements


The cores of braided wires and cables should be evenly braided, and the braid density should meet the process requirements. Wire breakage, looseness, scratches, and overlap are not allowed.


6. Handover and process records


Make various process records as required.


Tell the successor about the production tasks and the quality of the shift. Before leaving get off work, clean the floor of the machine and store the waste in the designated location.


If you have a rest or no one takes over, the power supply should be disconnected.


7. Safe production


Pay attention to safety during the production process. The length of the hair should not exceed the shoulders. Female workers should tie the hair flat.


The machine should be stopped when changing and putting on the plate.


The company also provides CNC Wire Mesh Weaving Machine and metal wire mesh weaving machine, please feel free to contact us if necessary


Whatsapp Skype E-mail QQ WeChat

+86 15733638066